FREE TOOL · Length Planner
Sewer Lateral Length and Liner Planner
Enter how far your cleanout is from the street and see what a lining job usually needs to know.

Four quick steps.
- 01
Measure from the cleanout
Pace it off or use a tape from the cleanout to the street.
- 02
Add bends and the main
Rough bends and where the lateral meets the main.
- 03
See what it means
Length changes how a lining job is planned.
- 04
Confirm with a locate
A locator and camera give the real length.
About this tool.
Is this length exact?
It is an estimate. The camera records the true length.
Does length change the repair method?
It can. Very long runs may be lined in sections or with a middle access point.
What if I have no cleanout?
We can often add one. See the cleanout service.
Related services.
A-02CIPP LiningLateral CIPP LiningThe lateral is the pipe that carries everything from your house to the street main. Lining it renews…No digSee the service
B-06MethodsCleanout InstallationA properly placed cleanout gives cameras, cleaning tools and liners a way into your line, and it can…Small access pitSee the service
C-05InspectionLocating and MappingA camera with a built-in transmitter and a surface receiver trace your pipe, marking its path, depth and…No digSee the service 